Status Bar |
Top Previous Next |
The following information is shown in the status bar:
•on the left: Project name of the active project (if you move over you will see the whole path) •in the center: Simulation status (number of calculated runs of all runs during stochastic simulation) •on the right: Name of loaded rainfall file
|